{"id":9869,"date":"2018-09-21T12:18:35","date_gmt":"2018-09-21T05:18:35","guid":{"rendered":"https:\/\/attconsult.azurewebsites.net\/?page_id=9869"},"modified":"2018-09-21T12:18:35","modified_gmt":"2018-09-21T05:18:35","slug":"ptt-gas-separation-plant-no-5","status":"publish","type":"page","link":"https:\/\/www.attconsult.com\/en\/oil-gas-industries\/ptt-gas-separation-plant-no-5\/","title":{"rendered":"PTT Gas Separation Plant No.5"},"content":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537507110952{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;]<\/p>\n<p><strong><span style=\"font-size: 14pt;\"> PROJECT NAME : PTT Gas Separation Plant No.5<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Owner :<\/strong> Petroleum Authority of Thailand (PTT)<\/p>\n<p><strong>Client :<\/strong> Samsung Engineering Co., Ltd.<\/p>\n<p><strong>Location :<\/strong>\u00a0 Map Ta Phut, Rayong province<\/p>\n<p><strong>Period of Services :<\/strong>\u00a0 2003 &#8211; 2005<\/p>\n<p><strong>Project Cost :<\/strong>\u00a0 NA<\/p>\n<p><strong>Scope of Services and Description of Duties :<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>ATT provided the works for Samsung Engineering Co., Ltd. (SEC) in two work packages as follow:<\/p>\n<p>&nbsp;<\/p>\n<p>1. Government Work Permits briefly include:<\/p>\n<p>&nbsp;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Plant expansion permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Jetty pipeline permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Construction permits;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Liquefied petroleum gas storage tank permits excluding NDE and Hydrotest;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Fuel oil storage tank permits;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Hazardous material storage permits;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Plant operation permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Custody transfer facility permits (excluding calibration work that performed by third party);<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Measuring device for volume and weight permits (excluding calibration work that performed by third party);<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Power supply permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Other permit (will liaise between SEC and Authority);<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Advice and review documents and drawings that require for permit obtaining and etc.<\/p>\n<p>&nbsp;<\/p>\n<p>2. Detailed Engineering Works for Multi-purpose Building, Gate House&amp; Landscape<\/p>\n<p>&nbsp;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Prepare designed works in detail in compliance with relevant codes and standards as specified by ITB and local regulations for applicability in Thailand.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Submitting the catalogue and sample of required material for design work (if required).<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Submitting detailed design works as drawing list and issue schedule for architectural and structural design, detail design for HVAC, electrical detail design, fire fighting system design, instrument detail design, landscape design for entire area, etc.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Software providing such AutoCAD R14, STADD III, Microsoft Word (V.6) or Microsoft Excel 2000, etc.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Drawing preparation standard.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 As-built drawing preparation.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Basic design review and comments.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Certifying document and drawing by registered professional engineer that required by Thai Law as specified.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Field supervision.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537507110952{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;] PROJECT NAME : PTT Gas Separation Plant No.5 &nbsp; Owner : Petroleum Authority of Thailand (PTT) Client : Samsung [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":9832,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9869"}],"collection":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/comments?post=9869"}],"version-history":[{"count":1,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9869\/revisions"}],"predecessor-version":[{"id":9870,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9869\/revisions\/9870"}],"up":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9832"}],"wp:attachment":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/media?parent=9869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}