{"id":9866,"date":"2018-09-21T12:12:59","date_gmt":"2018-09-21T05:12:59","guid":{"rendered":"https:\/\/attconsult.azurewebsites.net\/?page_id=9866"},"modified":"2018-09-21T12:12:59","modified_gmt":"2018-09-21T05:12:59","slug":"songkhla-gas-separation-plant","status":"publish","type":"page","link":"https:\/\/www.attconsult.com\/en\/oil-gas-industries\/songkhla-gas-separation-plant\/","title":{"rendered":"Songkhla Gas Separation Plant"},"content":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537506764024{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;]<\/p>\n<p><strong><span style=\"font-size: 14pt;\"> PROJECT NAME : Songkhla Gas Separation Plant<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Owner :<\/strong> Trans-Thailand Malaysia Co., Ltd.<\/p>\n<p><strong>Client :<\/strong> Samsung Engineering Co., Ltd.<\/p>\n<p><strong>Location :<\/strong>\u00a0 Songkhla Province<\/p>\n<p><strong>Period of Services :<\/strong>\u00a0 2003 &#8211; 2005<\/p>\n<p><strong>Project Cost :<\/strong>\u00a0 NA<\/p>\n<p><strong>Scope of Services and Description of Duties :<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>ATT provided the works for Samsung Engineering Co., Ltd. (SEC) in two work packages as follow:<\/p>\n<p>&nbsp;<\/p>\n<p>1. The Detail Designed of the North Access Bridge and the storm water drainage system:<\/p>\n<p>&nbsp;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Detail designed the north access bridge that cross the public cannel and near the northern gate of the plant. This bridge are reinforcement concrete, the dimensions 13&#215;70 meters (WxL);<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Designed the storm water drainage system out side the plant.<\/p>\n<p>&nbsp;<\/p>\n<p>2. Government Work Permits briefly include:<\/p>\n<p>&nbsp;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Plant established permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Construction permits;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Liquefied petroleum gas storage tank permits excluding NDE and Hydrotest;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Fuel oil tank permits;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Hazardous material storage permits;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Plant operation permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Boiler permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Electrical generator permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Power supply permit;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Other permit (will liaise between SEC and Authority);<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Advice and review documents and drawings that require for permit obtaining and etc.<\/p>\n<p>&nbsp;<\/p>\n<p>3. Detailed Engineering Works<\/p>\n<p>&nbsp;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Prepare designed works in detail in compliance with relevant codes and standards as specified by ITB and local regulations for applicability in Thailand.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Submitting the catalogue and sample of required material for design work (if required).<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Software providing such AutoCAD R14, STADD III, Microsoft Word (V.6) or Microsoft Excel 2000, etc.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Drawing preparation standard.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 As-built drawing preparation.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Basic design review and comments.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Certifying document and drawing by registered professional engineer that required by Thai Law as specified.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537506764024{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;] PROJECT NAME : Songkhla Gas Separation Plant &nbsp; Owner : Trans-Thailand Malaysia Co., Ltd. Client : Samsung Engineering Co., [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":9832,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9866"}],"collection":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/comments?post=9866"}],"version-history":[{"count":1,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9866\/revisions"}],"predecessor-version":[{"id":9867,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9866\/revisions\/9867"}],"up":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9832"}],"wp:attachment":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/media?parent=9866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}