{"id":9861,"date":"2018-09-21T12:07:21","date_gmt":"2018-09-21T05:07:21","guid":{"rendered":"https:\/\/attconsult.azurewebsites.net\/?page_id=9861"},"modified":"2018-09-21T12:08:10","modified_gmt":"2018-09-21T05:08:10","slug":"design-of-hvac-lighting-sanitary-plumbing-system-songkhla-ccpp","status":"publish","type":"page","link":"https:\/\/www.attconsult.com\/en\/oil-gas-industries\/design-of-hvac-lighting-sanitary-plumbing-system-songkhla-ccpp\/","title":{"rendered":"Design of HVAC, Lighting, Sanitary &#038; Plumbing System Songkhla CCPP"},"content":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537506486915{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;]<\/p>\n<p><strong><span style=\"font-size: 14pt;\"> PROJECT NAME : Design of HVAC, Lighting, Sanitary &amp; Plumbing System\u00a0Songkhla CCPP<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-9862\" src=\"https:\/\/attconsult.azurewebsites.net\/wp-content\/uploads\/2018\/09\/p_ShongkhlaCCPP.png\" alt=\"\" width=\"550\" height=\"400\" srcset=\"https:\/\/www.attconsult.com\/wp-content\/uploads\/2018\/09\/p_ShongkhlaCCPP.png 550w, https:\/\/www.attconsult.com\/wp-content\/uploads\/2018\/09\/p_ShongkhlaCCPP-300x218.png 300w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Owner :<\/strong> Electricity Generating Authority of Thailand (EGAT)<\/p>\n<p><strong>Client :<\/strong> Marubeni Corporation, Japan<\/p>\n<p><strong>Location :<\/strong>\u00a0 Chana District, Songkhla Province<\/p>\n<p><strong>Period of Services :<\/strong>\u00a0 2005 &#8211; 2008<\/p>\n<p><strong>Project Cost :<\/strong>\u00a0 Approx. 17,000 Million Baht<\/p>\n<p><strong>Scope of Services and Description of Duties :<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>Marubeni Corporation (MC), Japan and Siemens Power Generation, Germany are awarded of contract for Engineering, Procurement and Construction (EPC) to carry out Songkhla (later changed to Chana) Combined Cycle Power Plant (Songkhla CCPP), 700 MW at Chana district, Songkhla province, southern Thailand. The power plant is owned by EGAT, and will be commissioned in March 2008. The project consists of two (2) gas turbine-generator and one (1) steam turbine-generator units, total capacity of 700 MW. The gas turbines will be fired natural gas only. EGAT will assign this power plant as based load plant.<\/p>\n<p>&nbsp;<\/p>\n<p>ATT Consultants Co, Ltd. is the Consultant will undertake &#8220;Design of HVAC, Lighting, Sanitary and Plumbing System&#8221;. Each system of these shall be designed in accordance with design criteria that given by MC. Reference documents will be referred to EGAT&#8217;s Bidding Document No. EGAT 21\/2547-SKHCCI and the others related to the works. Location of installation, terminal points, specifications for design, etc. shall be carefully studied and recommended by ATT.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537506486915{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;] PROJECT NAME : Design of HVAC, Lighting, Sanitary &amp; Plumbing System\u00a0Songkhla CCPP &nbsp; &nbsp; Owner : Electricity Generating Authority [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":9832,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9861"}],"collection":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/comments?post=9861"}],"version-history":[{"count":2,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9861\/revisions"}],"predecessor-version":[{"id":9864,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9861\/revisions\/9864"}],"up":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9832"}],"wp:attachment":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/media?parent=9861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}