{"id":9828,"date":"2018-09-20T22:05:39","date_gmt":"2018-09-20T15:05:39","guid":{"rendered":"https:\/\/attconsult.azurewebsites.net\/?page_id=9828"},"modified":"2019-08-15T12:45:43","modified_gmt":"2019-08-15T05:45:43","slug":"detailed-design-and-construction-supervision-of-klong-toey-underground-substation","status":"publish","type":"page","link":"https:\/\/www.attconsult.com\/en\/power-engineering\/transmission-and-distribution-system-engineering\/detailed-design-and-construction-supervision-of-klong-toey-underground-substation\/","title":{"rendered":"Detailed Design and Construction Supervision of Klong Toey Underground Substation"},"content":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537455934977{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;]<\/p>\n<p><strong><span style=\"font-size: 14pt;\"> PROJECT NAME : Detailed Design and Construction Supervision of Klong Toey Underground Substation<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-9829 size-full\" src=\"https:\/\/attconsult.com\/wp-content\/uploads\/2018\/09\/p_project_Klong_Toey_Underground_Substation.jpg\" alt=\"\" width=\"800\" height=\"470\" srcset=\"https:\/\/www.attconsult.com\/wp-content\/uploads\/2018\/09\/p_project_Klong_Toey_Underground_Substation.jpg 800w, https:\/\/www.attconsult.com\/wp-content\/uploads\/2018\/09\/p_project_Klong_Toey_Underground_Substation-300x176.jpg 300w, https:\/\/www.attconsult.com\/wp-content\/uploads\/2018\/09\/p_project_Klong_Toey_Underground_Substation-768x451.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Owner :<\/strong> Metropolitan Electricity Authority (MEA)<\/p>\n<p><strong>Client :<\/strong> Metropolitan Electricity Authority (MEA)<\/p>\n<p><strong>Location :<\/strong>\u00a0 Klong Toey, Bangkok, Thailand<\/p>\n<p><strong>Period of Services :<\/strong>\u00a0 May 2015 \u2013 Apr. 2019<\/p>\n<p><strong>Project Cost :<\/strong>\u00a0 Approx. 700 Million Baht<\/p>\n<p><strong>Scope of Services and Description of Duties :<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>MEA is planning to construct a complete underground substation in Klong Toey district, Bangkok to interface with the existing and future distribution network. The underground substation is the first pilot project in Thailand. The purpose is to minimize future land use in the congested Bangkok area, minimize noise disturbance to neighboring resident and enhance public safety as well as environmental image. The project consists mainly of a complete four-story underground building about 22 m deep, four 115\/69\/24 kV \u2013 60 MVA power transformers, 115 &amp; 69 kV switchgear and complete substation automation and control systems, fire safety and building services systems, 115 &amp; 69 kV duct bank connecting with the existing distribution and future network.<\/p>\n<p>&nbsp;<\/p>\n<p>ATT Consultants Co., Ltd. and Electricite? de France had been assigned to perform the detailed design, cost estimation, tender document preparation and construction supervision of Klong Toey Underground Substation.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537455934977{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;] PROJECT NAME : Detailed Design and Construction Supervision of Klong Toey Underground Substation &nbsp; &nbsp; Owner : Metropolitan Electricity [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":9751,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9828"}],"collection":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/comments?post=9828"}],"version-history":[{"count":2,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9828\/revisions"}],"predecessor-version":[{"id":10243,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9828\/revisions\/10243"}],"up":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9751"}],"wp:attachment":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/media?parent=9828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}