{"id":9808,"date":"2018-09-20T19:38:56","date_gmt":"2018-09-20T12:38:56","guid":{"rendered":"https:\/\/attconsult.azurewebsites.net\/?page_id=9808"},"modified":"2018-09-20T19:38:56","modified_gmt":"2018-09-20T12:38:56","slug":"230-kv-underground-cable-link-between-lad-phrao-and-vibhavadi-substation-project","status":"publish","type":"page","link":"https:\/\/www.attconsult.com\/en\/power-engineering\/transmission-and-distribution-system-engineering\/230-kv-underground-cable-link-between-lad-phrao-and-vibhavadi-substation-project\/","title":{"rendered":"230 kV Underground Cable Link between Lad Phrao and Vibhavadi Substation Project"},"content":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537447125049{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;]<\/p>\n<p><strong><span style=\"font-size: 14pt;\"> PROJECT NAME : 230 kV Underground Cable Link between Lad Phrao and Vibhavadi Substation Project<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Owner :<\/strong> Metropolitan Electricity Authority of Thailand (MEA)<\/p>\n<p><strong>Client :<\/strong> Electricite&#8217; de France (EDF) (France) and Mott McDonald<\/p>\n<p><strong>Location :<\/strong>\u00a0 Bangkok, Thailand<\/p>\n<p><strong>Period of Services :<\/strong>\u00a0 1999 \u2013 2002<\/p>\n<p><strong>Project Cost :<\/strong>\u00a0 Approx. 2,600 Million Baht<\/p>\n<p><strong>Scope of Services and Description of Duties :<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>MEA had planned to build 230 kV underground transmission lines between two substations in Bangkok, from EGAT\u2019s Lad Phrao Substation to MEA\u2019s Vibhavadi Substation along Vibhavadi Road. Main components consist of 2 circuits of oil filled 230 kV cables installed in a 2.6 meter-inside-diameter tunnel of 8 km. length, and a cooling plant with water cooling pipes along the cables for reducing heat dissipation. The tunnel is approximately 15 m deep and is constructed by using a pipe jacking method. There are 19 shafts of approximately 400 m apart.<\/p>\n<p>&nbsp;<\/p>\n<p>ATT in association with Electricite&#8217; de France (EDF) and Mott McDonald have been appointed as the consultant to MEA to supervise the construction works.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537447125049{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;] PROJECT NAME : 230 kV Underground Cable Link between Lad Phrao and Vibhavadi Substation Project &nbsp; Owner : Metropolitan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":9751,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9808"}],"collection":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/comments?post=9808"}],"version-history":[{"count":1,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9808\/revisions"}],"predecessor-version":[{"id":9809,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9808\/revisions\/9809"}],"up":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9751"}],"wp:attachment":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/media?parent=9808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}