{"id":9797,"date":"2018-09-20T19:26:46","date_gmt":"2018-09-20T12:26:46","guid":{"rendered":"https:\/\/attconsult.azurewebsites.net\/?page_id=9797"},"modified":"2018-09-20T19:26:46","modified_gmt":"2018-09-20T12:26:46","slug":"consulting-services-for-substation-design-and-standard-drawing-and-specification-preparation-of-transmission-system-and-substation-development-project","status":"publish","type":"page","link":"https:\/\/www.attconsult.com\/en\/power-engineering\/transmission-and-distribution-system-engineering\/consulting-services-for-substation-design-and-standard-drawing-and-specification-preparation-of-transmission-system-and-substation-development-project\/","title":{"rendered":"Consulting Services for Substation Design and Standard Drawing and Specification Preparation of Transmission System and Substation Development Project"},"content":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537446398841{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;]<\/p>\n<p><strong><span style=\"font-size: 14pt;\"> PROJECT NAME : Consulting Services for Substation Design and Standard Drawing and Specification Preparation of Transmission System and Substation Development Project<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-9798 size-full\" src=\"https:\/\/attconsult.azurewebsites.net\/wp-content\/uploads\/2018\/09\/p_cssdDWGSpec.png\" alt=\"\" width=\"576\" height=\"431\" srcset=\"https:\/\/www.attconsult.com\/wp-content\/uploads\/2018\/09\/p_cssdDWGSpec.png 576w, https:\/\/www.attconsult.com\/wp-content\/uploads\/2018\/09\/p_cssdDWGSpec-300x224.png 300w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Owner :<\/strong> Provincial Electricity Authority of Thailand (PEA)<\/p>\n<p><strong>Client :<\/strong> Provincial Electricity Authority of Thailand (PEA)<\/p>\n<p><strong>Location :<\/strong>\u00a0 73 provinces of Thailand<\/p>\n<p><strong>Period of Services :<\/strong> 2002 &#8211; 2004<\/p>\n<p><strong>Project Cost :<\/strong> NA<\/p>\n<p><strong>Scope of Services and Description of Duties :<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>Provincial Electricity Authority (PEA) is responsible for the distribution of electric power in the area of the 73 provinces of Thailand. PEA intends to have 80 new substations 115\/22 or 33 kV to be built in the near future. All the substations shall be equipped with computerized substation control system.<\/p>\n<p>&nbsp;<\/p>\n<p>Consortium of Thai Consultant and international specialist, ATT and Electricite&#8217; de France (EDF) provided the engineering services with the following stages of work.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Task 1 :<\/strong> Review of the existing PEA conceptual design, standard drawings and specifications stage<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Task 2 :<\/strong> Conceptual Design Stage, Conceptual design works covering Three (3) main parts<\/p>\n<p>&nbsp;<\/p>\n<p style=\"padding-left: 30px;\">\u2022 First : Revising the existing PEA Conceptual Design<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Second : Unmanned Substation<\/p>\n<p style=\"padding-left: 30px;\">\u2022 Third : Compact Substation<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Task 3 :<\/strong> Detailed design and standard drawing preparation stage.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Task 4 :<\/strong> Standard specification preparation stage<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537446398841{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;] PROJECT NAME : Consulting Services for Substation Design and Standard Drawing and Specification Preparation of Transmission System and Substation [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":9751,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9797"}],"collection":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/comments?post=9797"}],"version-history":[{"count":1,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9797\/revisions"}],"predecessor-version":[{"id":9799,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9797\/revisions\/9799"}],"up":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/9751"}],"wp:attachment":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/media?parent=9797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}