{"id":10167,"date":"2018-09-22T14:48:28","date_gmt":"2018-09-22T07:48:28","guid":{"rendered":"https:\/\/attconsult.azurewebsites.net\/?page_id=10167"},"modified":"2018-09-22T14:48:28","modified_gmt":"2018-09-22T07:48:28","slug":"oil-terminal-of-multiproduct-pipe-line","status":"publish","type":"page","link":"https:\/\/www.attconsult.com\/en\/piping\/oil-terminal-of-multiproduct-pipe-line\/","title":{"rendered":"Oil Terminal of Multiproduct Pipe Line"},"content":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537602503714{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;]<\/p>\n<p><strong><span style=\"font-size: 14pt;\"> PROJECT NAME : Oil Terminal of Multiproduct Pipe Line<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Owner :<\/strong> Thappline Co., Ltd.<\/p>\n<p><strong>Client :<\/strong> Samsung Engineering &amp; Construction Co., Ltd. (Korea)<\/p>\n<p><strong>Location :<\/strong>\u00a0 Thappline Terminal, Saraburi province, Thailand<\/p>\n<p><strong>Period of Services :<\/strong>\u00a0 1992 &#8211; 1993<\/p>\n<p><strong>Project Cost :<\/strong>\u00a0 Approx. 800 Million Baht<\/p>\n<p><strong>Scope of Services and Description of Duties :<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>To review and approve all calculation and construction drawings for 16 oil tanks and foundations as follows:<\/p>\n<p style=\"padding-left: 30px;\">\u2022 2 of 4.2 ML premium gasoline tanks<\/p>\n<p style=\"padding-left: 30px;\">\u2022 3 of 7.8 ML regular gasoline tanks<\/p>\n<p style=\"padding-left: 30px;\">\u2022 3 of 38.5 ML high speed diesel tanks<\/p>\n<p style=\"padding-left: 30px;\">\u2022 3 of 0.6 ML interface tanks<\/p>\n<p style=\"padding-left: 30px;\">\u2022 3 of 3.7 ML unleaded gasoline tanks<\/p>\n<p style=\"padding-left: 30px;\">\u2022 1 of 0.3 ML slop tank<\/p>\n<p style=\"padding-left: 30px;\">\u2022 1 of 0.6 ML MTBE tank<\/p>\n<p>&nbsp;<\/p>\n<p>To provide detailed design for buildings including architectural, civil, geotechnical, air conditioning, lighting, telephone, fire protection and lightning protection works.<\/p>\n<p>The main buildings consist the followings:<\/p>\n<p style=\"padding-left: 30px;\">\u2022 administration &amp; control building, 1,500 sq.m.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 workshop &amp; external store, 920 sq.m.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 2 substations, 450 and 140 sq.m. each<\/p>\n<p style=\"padding-left: 30px;\">\u2022 loading island, 5,440 sq.m.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 entrance and exit control building 1,300 sq.m.<\/p>\n<p style=\"padding-left: 30px;\">\u2022 other small buildings<\/p>\n<p>&nbsp;<\/p>\n<p>To provide detailed design of oily water drainage system.<\/p>\n<p>&nbsp;<\/p>\n<p>To assist the client in obtaining the construction and operation permits from the Public Works Department. The scope included the application preparation to authorities, and coordination with government officials.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1519185297550{padding-top: 65px !important;padding-bottom: 63px !important;}&#8221;][vc_row full_width=&#8221;stretch_row&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1519125593762{margin-top: 0px !important;margin-bottom: 0px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/6&#8243; css=&#8221;.vc_custom_1519125604463{margin-left: 0px !important;padding-left: 42px !important;}&#8221;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1537602503714{margin-top: 15px !important;margin-bottom: 30px !important;padding-top: 0px !important;padding-bottom: 0px !important;}&#8221;] PROJECT NAME : Oil Terminal of Multiproduct Pipe Line &nbsp; Owner : Thappline Co., Ltd. Client : Samsung Engineering [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":10148,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/10167"}],"collection":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/comments?post=10167"}],"version-history":[{"count":1,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/10167\/revisions"}],"predecessor-version":[{"id":10168,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/10167\/revisions\/10168"}],"up":[{"embeddable":true,"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/pages\/10148"}],"wp:attachment":[{"href":"https:\/\/www.attconsult.com\/en\/wp-json\/wp\/v2\/media?parent=10167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}